Figure: Existing Power System as of 2018 from: Philippine Department of Energy; "Existing Power System"; Philippine Energy Plan 2018-2040 (accessed 10 Feb 2021).
In 2018, the total peak demand across the Philippines was 14,782 MW. In 2019, this increased by 5.4% to 15,581 MW. Across the three main grids, Luzon took up 11,344 MW or 72.8% of the total demand while Visayas had 2,224 MW or 14.3% of the share and Mindanao used 2,013 MW or 12.9% of the share. Luzon saw an increase of 4.3% while Visayas grew by 8.3% and Mindanao by 8.6% with reference to the previous year. (2019 Philippine Situation Report 2)